Article 2: Ikea Store, Coventry, England
Bison Precast concrete has been involved in the development of the IKEA building in Coventry, which will be a seven story complex which stands 35 metres high
Approximately 4600 components, comprising of 42 000 m2 of hollow core components were used in the design
The fixtures and fittings necessary to control and guide the lifts were cast into the walls in the factory, as opposed to being bolted on-site, speeding up the fit-out process.
LINK TO ARTICLE
Thursday, May 8, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment